Place of Origin: | China |
Brand Name: | Paneltek |
Certification: | CE, ISO, TUV |
Model Number: | Terracotta Panels |
Minimum Order Quantity: | negotiation |
---|---|
Packaging Details: | wooden boxes |
Delivery Time: | 15 working days |
Payment Terms: | T/T |
Supply Ability: | 2500 SQM per day |
Material: | Nature Clay | Color: | Red |
---|---|---|---|
Thickness: | 18mm | Finish: | Polished |
Weight: | 31 Kg/sqm | Usage: | Building Envelope |
18 thickness Polished Finish Red Terracotta Panels Wall Cladding
Polished surface detail
--
THE WALL COVERING OR EXTERNAL FACING
It is important to first choose the materials to be used to give the best aesthetic and qualitative results, as it will be the external covering that improves the building appearance.
Indeed, its function is that of characterizing the building appearance as well as protecting the walls from atmospheric polluting agents and achieving the performance levels. As a safety measure 5x5 mm fibreglass netting is bonded to the back of each slab to temporarily hold together any broken slab pieces until the tiles can be replaced.
The covering materials of a ventilated wall must meet the following requirements:
Terracotta panels have all these characteristics, making them technically better than quarry materials and classifying them as one of the most suitable materials for ventilated facades.
--- F18 Size Drawing (Thickness: 18MM)
--- Installation
Unique dry-hanging installation can lower the cost of the whole curtain wall system as well as increase firmness.
1. Measurement & line laying
Take a theodolite or level to mark the horizontal and vertical lines for supporting poles.
2. Columns Installation
Secure columns on the main structure with brackets and stainless steal bolts, adjust the
verticality of the supporting columns.
3. Brackets/Supporting Rails Installation
Secure them on the columns with stainless steel bolts/screws, adjust the verticality and horizontality of the columns.
4. Terracotta Panels Installation
1) Apply the adhesive tapes on supporting rails or columns as the joint pieces.
2) Position terracotta panels and clips, adjust the verticality and horizontality of the terracotta panels by clips.
3) Fix panels from bottom up to finish the installation.
5.Sealant Application
There is no need to apply sealant for open system, while for closed system is necessary to do so in the vertical and horizontal joints of terracotta panels.
6. Curtain Wall Cleanup
Cleanse the installed terracotta panels with water.